Graduate & funder report β»
Incubation North
Incubation
Incubation North Β· Pre-IncubationAccelerator
Growth cohort H1 Β· Seed AcceleratorThe loop closes: funder reporting with a source on every value, graduation, handover and the virtuous cycle-closers.
Acceleration Guide: Next: publish the graduating cohort to the Exchange.
Context βΎ
Graduated
6
Funding secured
NOK 9.4M
Targets met
83%
Retro & calibration
Proposed
Retro draft: tighten the pivot threshold (engagement < 50 by week 6 predicted the one intervention); re-weight intake toward execution-readiness. This feeds Step 1 of the next cycle. Β· cycle outcomes
Retro & calibration
One retro that closes the loop β alumni outcomes, the patterns worth reusing, and the rejected-who-succeeded. Re-weight the signals; it feeds Step 1 of the next cycle.
Alumni β outcome-linked
- Alpha ASSeed round closed (NOK 4.2M)register-verified
- Beta ASActive in the company register, 6 employeesregister-verified
- Gamma ASRevenue NOK 1.1M (self-report)self-report
Reusable patterns β _Templates
- Early design-partner traction predicts the readiness-level delta.β 3 of 6 graduates; strongest single signal this cohort.
- Engagement < 50 by week 6 predicts the one intervention.β Beta AS β tighten the pivot threshold next cohort.
Anti-cohort β rejected, validation clock (calibration gold)
- Applicant Q β Hyperloop LabsRe-check 2026-10-01Register discrepancy on revenue (self-report NOK 12M vs register NOK 0.3M); no offsetting register strength.
- Applicant X β Tidlig IdΓ©Re-check 2026-09-15Too early (pre-MVP) for this cohort; validation clock set.Re-check Q4: launched a paid MVP β calibration signal (consider broader intake).
TALK TO THE PROGRAM β about this sub-step