KOLLIEDAccelerator

Graduate & funder report ↻

Incubation North
Company
Alpha AS
Companies in Incubation North
demo

The loop closes: funder reporting with a source on every value, graduation, handover and the virtuous cycle-closers.

Acceleration Guide: Next: publish the graduating cohort to the Exchange.
Context β–Ύ
Graduated
6
Funding secured
NOK 9.4M
Targets met
83%

Retro & calibration

Proposed
Retro draft: tighten the pivot threshold (engagement < 50 by week 6 predicted the one intervention); re-weight intake toward execution-readiness. This feeds Step 1 of the next cycle. Β· cycle outcomes

Retro & calibration

One retro that closes the loop β€” alumni outcomes, the patterns worth reusing, and the rejected-who-succeeded. Re-weight the signals; it feeds Step 1 of the next cycle.

Alumni β€” outcome-linked
  • Alpha ASSeed round closed (NOK 4.2M)register-verified
  • Beta ASActive in the company register, 6 employeesregister-verified
  • Gamma ASRevenue NOK 1.1M (self-report)self-report
Reusable patterns β†’ _Templates
  • Early design-partner traction predicts the readiness-level delta.β€” 3 of 6 graduates; strongest single signal this cohort.
  • Engagement < 50 by week 6 predicts the one intervention.β€” Beta AS β€” tighten the pivot threshold next cohort.
Anti-cohort β€” rejected, validation clock (calibration gold)
  • Applicant Q β€” Hyperloop LabsRe-check 2026-10-01
    Register discrepancy on revenue (self-report NOK 12M vs register NOK 0.3M); no offsetting register strength.
  • Applicant X β€” Tidlig IdΓ©Re-check 2026-09-15
    Too early (pre-MVP) for this cohort; validation clock set.
    Re-check Q4: launched a paid MVP β€” calibration signal (consider broader intake).
TALK TO THE PROGRAM β€” about this sub-step
Documents & archive β–Ύ
Documents & archive β€” drag in or upload; lands in the archive folder with source and version.Archive: _Program (+ 08 Β· Graduate) β†’